Continuing Education Session 7

$190.00

Complete your required continuing education online! This is the Session 7 continuing education course.
All licensed Journeyman & Master plumbers must complete this course by May 1st, 2016.

Description

Complete your required continuing education online! This is the Session 7 continuing education course.
All licensed Journeyman & Master plumbers must complete this course by May 1st, 2016.
Required Hours: 6
Read below for the topics covered in this course.

Note: Quizzes are at the end of nearly every section of this online course. You must obtain a score of 70% or higher for each quiz to continue and complete the Session 7 course.

Plumbing Topics

-Introductions
-Board Updates
     •Laundry Sink Requirements in Dormitories
     •Multiple Heads – Residential Shower – Drain Size
     •Vacuum Systems – PVC allowance
     •Pipefitter Regulation
     •Grandfathering period
-Water Hammer Arrestors
-Sewer Ejectors
     •When are they allowed?
     •Grinder Pumps
-Backwater Valves
     •Where are they allowed
-Piping for R/O Water Systems
     •Allowable Material
     •Drinking Water
     •Dialysis Equipment
-Battery Venting
     •Different Configurations
-Grease Interceptors
     •Inside Interceptors
     •Sizing of 3 bay sink drain
     •G101 Standard
     •Grease removal units
     •Outside Traps
     •Jurisdiction
-Medical – Separate Facilities for Patients and Staff
-OSHA Update (Provided by OSHA 15 min)
     •Trenching
     •Safety
     •Competency
-248 CMR 10.05 (5)
     •Trenching

Gas Topics

-Introductions
-Board Updates
     •Board Staff Changes
     •Variances – Pre and Post – Who Files
     •Variances for Unlisted Gas Equipment
     •Board Interpretation – accessible gas appliance shut-off
     •Board Interpretation – CSST exposed outside above ground
     •Board Interpretation – Product Acceptance – Flexible gas risers
     •Existing Chimney Review – CO Detectors – Inspection – Affidavits
     •E-licensing Update
     •Status on Gas Code Changes – Need new code books!
     •NFPA54-2012
     •NFPA58-2011
     •248 CMR Section 4.00 – 5.00 – 7.00 – 8.00
-NFPA 54 Chapter 6 and Massachusetts Modifications
     •Piping Underground
     •Installation of Piping
     •Concealed Piping
     •Piping in Chases
     •Drips and Sediment Traps
     •Outlets
     •Branch Pipe Connections
     •Valves
     •Prohibited Devices
     •Bonding
-MGL Chapter 142
     •Section 1
     •Master – Journeyman
     •Section 21A
     •Liability Insurance

Reviews

There are no reviews yet.

Be the first to review “Continuing Education Session 7”

Your email address will not be published. Required fields are marked *